
Peter joined British Rail as a trainee Technician in September 1976. Between 1978 and 1988 he worked in Western Tower, then returned to Reading Panel. Peter is now a Technical Assistant - though more often than not he will be referred to by the Signalmen as Mr Fixit. Peter can most often be found maintaining the various remote digital signalling links.